Skip to content

Setting up zones and stages

Last updated:

You set up a site once. Draw its zones on a plan, name each zone the way your team says it out loud, and decide which zones stand for a stage of the turnaround, such as the wash bay or the workshop. After that, every sighting lands in a zone, and every asset that enters a stage zone moves to that stage.

Upload a plan or an aerial view of the site, then draw an area for each row, rack, bay or building. Draw zones at the size your team searches in. See Zones and accuracy for what works and what does not.

Stages follow your turnaround. A typical rental yard uses:

Stage Typical zone
Out on hire Off site, or with a vehicle
Returned Gate or return area
Washed Wash bay
Checked Workshop or inspection bench
Ready to rent Ready line or a row

Rename or add stages to match how your yard works.

An asset moves to a stage when it is heard in that stage’s zone. A site gateway in the zone logs this on its own. Without a gateway, the stage updates when a phone passes by. Staff can also set a stage by hand in the app.

Hirro records when each asset enters and leaves a stage, so you see how long assets wait in each stage. Exact dwell times need a site gateway at that zone, because a phone only hears an asset when someone walks past.